Tim & Cherie's Blog http://www.timandcherie.com/ Tim & Cherie's Blog en-us plans and sections http://www.timandcherie.com/index.cfm?postID=112 http://www.timandcherie.com/index.cfm?postID=112 Thu, 02 Feb 2012 15:06:00 GMT

]]>
program http://www.timandcherie.com/index.cfm?postID=111 http://www.timandcherie.com/index.cfm?postID=111 Sun, 22 Jan 2012 14:29:00 GMT
]]>
site analysis http://www.timandcherie.com/index.cfm?postID=110 http://www.timandcherie.com/index.cfm?postID=110 Mon, 16 Jan 2012 14:14:00 GMT

]]>
week 1 - PRECEDENTS http://www.timandcherie.com/index.cfm?postID=109 http://www.timandcherie.com/index.cfm?postID=109 Sun, 15 Jan 2012 18:47:00 GMT



Culinary Art School
Jorge Garcia

Interesting small culinary school loacted in Tijuana Mexico. Aprox. 9,000 sq. ft.
See full description with more photos here.

Download PDF below.


download precedent1 copy.pdf

Institue for the Culinary Arts
HDR

Brand new culinary school with oversized classroom space. Program is almost 40,000 sq. ft. See description and photos here.


download precedent2.pdf

60 Richmond Street East
Teeple Architects

This is a mixed use building, not a school, that provides residences for the hospitality and restaurant industry. The design creates a sustainable eco system in an urban enviroment. This could be a resource you use in considering your own design.

Again, more info. here.


download precedent 3.pdf

]]>
Hanna video http://www.timandcherie.com/index.cfm?postID=107 http://www.timandcherie.com/index.cfm?postID=107 Fri, 30 Dec 2011 15:27:00 GMT


]]>
Almost the Final Presentation http://www.timandcherie.com/index.cfm?postID=106 http://www.timandcherie.com/index.cfm?postID=106 Sun, 04 Dec 2011 23:56:00 GMT
+ refined pavement texture
+ reduced line weight for curbing and contours
+ added flora/fauna
+ tweaked parking, bus radius, maintanence turn around



Updated arrival rendering

adjusted some shadows


updated entrance rendering:

Note the adjusted window!!!


New tent rendering:

Took your suggestion to "set the plate".


I have a set of basic floor plans and my program sketch from mid-review. Should these be pinned on the wall at the final review?

do i need to include a North arrow on the plans if the arrow already appears on several other drawings?



Site section and parking section:
no changes made since last week.

Do I need any other sections?


Still to be completed:

Update my 1" = 40' Campus plan
Complete accessibility diagram
Am I missing anything?

]]>
Belated Birthday Hanna! http://www.timandcherie.com/index.cfm?postID=105 http://www.timandcherie.com/index.cfm?postID=105 Tue, 29 Nov 2011 09:24:00 GMT


]]>
rain garden http://www.timandcherie.com/index.cfm?postID=103 http://www.timandcherie.com/index.cfm?postID=103 Sat, 26 Nov 2011 15:55:00 GMT
In my current project, water is collected from impervious materials (roofs, terraces, etc.) and is funneled into perforated lines in the ground that empty into rain gardens. These rain gardens are filled with natively planted vegetation that thrive in the wet environment and help water to infiltrate into the ground.

Here is a perpective drawing of the East side of my building with a planned rain gardens.


]]>
Pics by the Wiebners http://www.timandcherie.com/index.cfm?postID=102 http://www.timandcherie.com/index.cfm?postID=102 Mon, 21 Nov 2011 22:04:00 GMT an awesome photo shoot of the family. If you remember, the Wiebners did an awesome job last year with pictures of Carrie.

Thanks Joel and Rita!


]]>
Visitor Center http://www.timandcherie.com/index.cfm?postID=101 http://www.timandcherie.com/index.cfm?postID=101 Fri, 18 Nov 2011 15:19:00 GMT Fonthill Museum site and locating the best spot for the visitor center. Here are a few previews of my project.




BONUS: Entrance perspective


]]>